ERCOT speed-to-power study
Find out if your site can get power faster.
For a named site of 75 MW or more waiting on firm interconnection, Pallara checks the credible paths against your firm date and reports the fastest one that holds up. $15,000 per site, delivered in 10 business days after your site inputs arrive. If no path beats the firm date, there is no invoice.
Request the studyDecision support only. The study never guarantees an energization date, a queue position, or MW.
Three solved examples.
A demonstration on public data
A flexible workload moves into cheaper intervals. Every job still completes within its window. Historical ERCOT prices are real. Facility, workload, and contract terms are illustrative. These frozen examples were solved and independently checked in energy-core; selecting a tab loads that recorded result.
Contract sensitivity
The cheapest hour is not the cheapest bill.
One flexible workload, one day of historical ERCOT prices, every deadline still met. Move the demand charge in the contract and watch which schedule is actually correct change with it. Every point below was solved by the same optimizer and priced by the same contract calculator used for the examples on this page.
01 · Confirm the fit
Describe the site and its firm date. Pallara checks the site size, the interconnection position, and whether a faster path is worth testing.
02 · Agree on the work
Review the scope, exclusions, delivery timing, and the fixed $15,000 price. Payment follows your acceptance.
03 · Keep the result
Receive the study in your private case: the fastest path that holds up, or a clear statement that none does, with the evidence behind it.
Your site
Request the study.
Start with the site. No files or payment here. Pallara checks the fit before opening a private case.
- Your site, its size in MW, and where it stands on interconnection
- Your firm interconnection date, and the date you actually need power
- The decision you need to make, and when you need it